The majority of the enabling activities, essentially work to prepare the site for the main works that will commence next year, began in June and will continue till November 2017.
Who’s in charge of these? CVBJV (Costain, Vinci Construction Grands Projects, Bachy Soletanche Joint Venture) While these works are underway we are working with Tideway/CVB to reduce the noise and vibration impacts on S. Paul’s. This will be through controls and mitigation measures.
The enabling works are as follows:
- Highway works and installation of one-way system
- Construction of temporary site access/exit
- Site Boundary Hoarding
- Site Clearance
- Archaeological Investigations
- Install drainage system and ducting
Working hours are Monday to Friday 08:00 – 18:00 Saturday 08:00 – 13:00 and maintenance works consisting of low impact activities such as refuelling, moving site fences, cleaning activities and vehicle repairs on Sundays between 10:00 – 16:00.
Prior to commencement of enabling works at the Deptford Crossfield Site, baseline noise and vibration monitoring will be carried out, along with a full survey of the church carried out by Alan Baxter.